Work Packages and Milestones
Descriptions from Project proposal (as .doc file). Work Package 1 is general project management, coordination and reporting.
Work Package 2: analysis
- Lead: eGA
- Time needed: 3 months (month 1-3)
- Deliverables: analysis report, that allows to formulate recommendation
- Milestone: -
Work Package 3: recommendations
- Lead: eGA
- Time needed: 1 month (month 4)
- Deliverables: a) technical specifications and functionalities of the new tool (terms of reference) b) recommendations on use of the new tool
- Milestone: recommendations are made on the basis of the analysis
Work Package 4: tender procedure
- Lead: SC
- Time needed: 3 months (month 5-7)
- Deliverables: development contract
- Milestone: a subcontractor has been chosen
Work Package 5: development
- Lead: SC
- Time needed: 6 months (month 8-13)
- Deliverables: adapted tool (“TID+”)
- Milestone: the tool is ready for testing and has been preliminarily accepted by the State Chancellery
Work Package 6: trial
*Time needed: 3 months (month 14-16)
- Deliverables: a) fine-tuned tool and procedures for use b) representative data concerning quantity and quality of use
- Milestone: -
Work Package 7: evaluation
- Lead: eGA
- Time needed: 1 month (month 17)
- Deliverables: report on the improvements made and their practical results
- Milestone: the tool is ready for implementation and further dissemination
Work Package 8: implementation
- Lead: SC
- Time needed: 1 month (month 18)
- Deliverables: working tool and procedures
- Milestone: the tool is disseminated and handed over to the end-users
Work Package 9: results viability and dissemination
- Lead: EUI
- Time needed: project duration (18 months)
- Deliverables: a) two workshops and two conferences, detailed in section G of this proposal; b) communication on the project to the general audience and targeted communication to certain interest groups; c) public project website, grouping all relevant information and offering a forum for discussion
- Milestone: -